AI
← Katalogga qaytish
Faol

LPK uchun assortimentdagi utga chidamli materiallari (Texnik topshiriqqaga muvofiq)

Byudjet
Ko'rsatilmagan
Muddat
23 sentabr 2026
Asl tenderni ochish

Tavsif

Arc furnace refractory lining materials (bricks, masses, mixtures) for the armature layer of an electric steel-melting furnace in the Casting-Rolling Complex's steel shop — new, unused items per technical specifications (Appendices 1–2). Delivery to AO Uzmetkombinat warehouse. Operating conditions: 310 working days annually, ~29–30 heats per day (120±2 tonnes each, 49 minutes per heat cycle), extreme temperatures up to 1700°C. Materials must meet physical-chemical properties and geometric parameters specified in the TZ (Appendix 2). Purpose: lining installation and refractory repair to ensure uninterrupted steel production. Deadline: 23 September 2026. Supplier responsible for determining HS codes and adhering to agreed delivery schedule.

Spetsifikatsiya

Olovga chidamli mahsulotlar

Ariza ta'minoti
1 %

Buyurtmachi hujjatlari va kontaktlari yashiringan

  • Tender hujjatlari
  • Buyurtmachi kontaktlari
  • Bozor va buyurtmachi bo‘yicha analitika
Bepul ro'yxatdan o'ting — saqlangan qidiruvlar va Telegram-alertlar

To'liq kirish kerakmi? Pro'ni rasmiylashtiring

O'xshash tenderlar

Telegram'da yirik tenderlar

Hafta g'oliblari va eng katta lotlar — har kuni

Obuna bo'lish